Description
E01: A conversation with Darlene van Uden, Design Director at Infinite Scale. In this kickoff episode, we talk about the society of experiential graphic design (SEGD), budgeting a signage project, working in revit, ensuring stakeholders voices are heard, and what it feels like when a project goes well.
Company
Infinite Scale
Tags
Experiential Graphics
Signage & Wayfinding
Sports
Brand Identity
Release Date

Intro

Darlene and I connected at the 2022 Society of Experiential Graphic Design (SEGD) conference in Portland. Our conversation starts mid-way through reminiscing about the experience we had and sharing the joy of being surrounded by our peers.
 

Watch & Listen

Podcast Snippet
Full Episode
 
Listen on Spotify
 

Links
Darlene van Uden - LinkedIn | Instagram
 

References

Terms & Definitions
Schematic Design (SD) - First of five* phases in a typical architecture project. Learn more here.
Design Development (DD) - Second of five* phases in a typical architecture project. See above link for more information.
Guaranteed Maximum Price (GMP) - Method of pricing used in contracts. Fairly safe when used in known project parameters - but can be limiting when there are many unknown variables that impact costs. Learn more here.
Furniture, Fixtures & Equipment (FF&E) - My engineering professor used to say “If you imagine a building as a dollhouse and if you shake everything out - the things that fall out are ‘FF&E’.” See description here.
Software
Revit - Building information modeling (BIM) software designed by Autodesk. BIM software exists to bridge the information gap between design and construction. Learn more.
Adobe Creative Suite - Design software suite consisting of software such as Photoshop, InDesign, and Illustrator. Sometimes referred to as “Adobe Suite” or “Creative Cloud.” See here for all software in the creative suite.
Sign Agent - Wayfinding and signage project management platform. Visit website.
 
*Some sources will list more than 5 phases because pre-design and other phases are included. It’s important to sync with the team because many projects are budgeted by phase and may require work to be broken up and billed within a specific phase.